Joined
·
103 Posts

Hey,
Havent got much to show just yet, so far got intercooler and smaller radiator bracketed on, done some intercooler piping but had to use high pressure hose for a little bit ''just for now'' as we only got enougth bends for other side, got injectors in, oil lines done, manifold and dump pipe should be made this weekend and set up, etc and everything else that needs to be finished, if I am lucky turbo set up will be finished in a week, if not then 1 1/2 weeks or so on,
have pics when turbo finshed and then its just certification for turbo and lowering, then onto prep - paint and setting everything back up, cant wait :number1